Projects per year
Search results
-
Active
Go with the flow: Hydrodynamic resilience to invasive mussels
Peterson, J. M., Herb, W. R. & Kozarek, J.
1/1/24 → 12/31/26
Project: Research project
-
Ice Loading on Piers for Minnesota's Bridges
MN DEPARTMENT OF TRANSPORTATION
7/5/23 → 2/28/26
Project: Research project
-
Assessing the Need for Floodplain Culverts Based
Kozarek, J. & Hernick, M. A.
MN DEPARTMENT OF TRANSPORTATION
6/23/23 → 2/28/26
Project: Research project
-
Development of Erosion Control Product Longevity Test Methodology
Chapman, J. A., Barney, B. M., Forman, R. & Kozarek, J.
MN DEPARTMENT OF TRANSPORTATION
10/7/22 → 6/30/26
Project: Research project
-
Finished
Flume design for experimental research in ecohydraulics and biomechanics of endangered sturgeon
Marr, J. D., Hondzo, M. & Kozarek, J.
7/1/19 → 6/30/20
Project: Research project
-
COLLABORATIVE RESEARCH: Linking turbulent flow dynamics to meandering river migration
Kozarek, J. & Limaye, A. B.
THE NATIONAL SCIENCE FOUNDATION
9/1/18 → 5/31/23
Project: Research project
-
COLLABORATIVE RESEARCH: Linking turbulent flow dynamics to meandering river migration
Kozarek, J. & Limaye, A. B.
9/1/18 → 5/31/23
Project: Research project
-
Assessing Culverts in Minnesota: Fish Passage and Storm
MN DEPARTMENT OF TRANSPORTATION
7/27/18 → 11/30/21
Project: Research project
-
Proposal for research support of sturgeon dispersal expe
Marr, J. D., Hondzo, M. & Kozarek, J.
5/31/18 → 9/30/18
Project: Research project
-
Measuring and modeling denitrification hot spots on agri
Hondzo, M., Kozarek, J. & Sadowsky, M. J.
USDA Nat'l Inst. of Food & Agriculture
8/1/15 → 7/31/19
Project: Research project
-
Project to Assess the Ecological Impact of the St. Antho
MINNEAPOLIS RIVERFRONT CORPORATION, LEGISLATIVE-CITIZEN COMMISSION ON MN RES
7/1/15 → 6/30/16
Project: Research project
-
Use of Mussel Spat Rope for Fish Passage in Culverts
MN DEPARTMENT OF TRANSPORTATION
11/24/14 → 3/31/18
Project: Research project
-
-
Conserving Minnesota's native mussel legacy: Quantifying habitat interactions
LEGISLATIVE-CITIZEN COMMISSION ON MN RES
7/1/14 → 6/30/18
Project: Research project
-
Culvert Length and Interior Lighting Impacts to Topeka S
Kozarek, J. & Hatch, J. T.
MN DEPARTMENT OF TRANSPORTATION
4/3/14 → 11/30/17
Project: Research project
-
Analyzing and optimizing denitrification in agricultural
Kozarek, J., Hondzo, M. & Sadowsky, M. J.
7/26/13 → 12/31/16
Project: Research project
-
Laboratory Study of Culvert Sedimentation for Fish Passa
MN DEPARTMENT OF TRANSPORTATION
8/1/12 → 2/28/15
Project: Research project
-
Collaborative for Sediment Source Reduction: Greater Blu
Gran, K. B., Kozarek, J. & Marr, J. D.
5/1/12 → 6/30/16
Project: Research project