Projects per year
Search results
-
Active
School times impact on students walking or biking to school: safe routes to school
MN DEPARTMENT OF TRANSPORTATION, US DOT FEDERAL HIGHWAY ADMINISTRATION
8/29/23 → 8/30/25
Project: Research project
-
Impacts of shared mobility on infrastructure usage, greenhouse gas emissions, and accessibility
MN DEPARTMENT OF TRANSPORTATION
8/22/23 → 8/31/25
Project: Research project
-
Development and demonstration of a novel Red Light Running Warning System using connected v2i technology
MN DEPARTMENT OF TRANSPORTATION, US DOT FEDERAL HIGHWAY ADMINISTRATION
12/15/22 → 12/31/24
Project: Research project
-
Haul Road and Detour Maintenance
MN DEPARTMENT OF TRANSPORTATION
12/6/22 → 6/30/25
Project: Research project
-
Towards implementation of max-pressure control on Minnesota roads: Phase 2
MN DEPARTMENT OF TRANSPORTATION
8/29/22 → 10/31/24
Project: Research project
-
Mobile-device data, non-motorized traffic monitoring, and estimation of annual average daily bicyclist and pedestrian flows
MN DEPARTMENT OF TRANSPORTATION
6/11/21 → 6/30/24
Project: Research project
-
Extending max-pressure control for traffic network operations
THE NATIONAL SCIENCE FOUNDATION
9/1/19 → 7/31/24
Project: Research project
-
Finished
-
Extending Max-Pressure Control for Traffic Network Operations
9/1/19 → 8/31/23
Project: Research project
-
Towards implementation of max-pressure signal timing on Minnesotan roads
MN DEPARTMENT OF TRANSPORTATION
7/17/19 → 1/31/23
Project: Research project
-
Generating Traffic Information from Connected Vehicle V2V Basic Safety Messages
MN DEPARTMENT OF TRANSPORTATION
8/31/18 → 3/31/21
Project: Research project
-
Cost/Benefit Analysis of Fuel Efficient Speed Control Using Signal Phasing and Timing (SPaT) Data: Evaluation for Future Connected Corridor Deployment
Hawkins, R. R. H. & Levin, M. W.
4/15/10 → 7/31/22
Project: Research project