TY - JOUR
T1 - Expanding scope and computational challenges in process scheduling
AU - Castro, Pedro M.
AU - Grossmann, Ignacio E.
AU - Zhang, Qi
PY - 2018/6/9
Y1 - 2018/6/9
N2 - In this paper, we present a brief overview of enterprise-wide optimization and challenges in multiscale temporal modeling and integration of different models for the levels of planning, scheduling and control. Next, we review Generalized Disjunctive Programming (GDP), as a new modeling paradigm for scheduling problems that are illustrated with the STN and RTN models. We then address scheduling problems that expand the scope of the area: simultaneous scheduling and heat integration, pipeline scheduling, crude oil and refined products blending, and demand side management. We illustrate the advantage of the GDP modeling framework, describe effective strategies for global optimization, and describe multistage affinely adjustable robust optimization for uncertain interruptible load. We address integration of planning and scheduling, for which several approaches are reviewed, including use of traveling salesman constraints for multiperiod refinery planning, and multisite planning and scheduling of multiproduct batch plants. We report computational results to highlight the challenges.
AB - In this paper, we present a brief overview of enterprise-wide optimization and challenges in multiscale temporal modeling and integration of different models for the levels of planning, scheduling and control. Next, we review Generalized Disjunctive Programming (GDP), as a new modeling paradigm for scheduling problems that are illustrated with the STN and RTN models. We then address scheduling problems that expand the scope of the area: simultaneous scheduling and heat integration, pipeline scheduling, crude oil and refined products blending, and demand side management. We illustrate the advantage of the GDP modeling framework, describe effective strategies for global optimization, and describe multistage affinely adjustable robust optimization for uncertain interruptible load. We address integration of planning and scheduling, for which several approaches are reviewed, including use of traveling salesman constraints for multiperiod refinery planning, and multisite planning and scheduling of multiproduct batch plants. We report computational results to highlight the challenges.
KW - Demand side management
KW - Generalized disjunctive programming
KW - Mixed-integer programming
KW - Planning
KW - Scheduling
UR - http://www.scopus.com/inward/record.url?scp=85042377818&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=85042377818&partnerID=8YFLogxK
U2 - 10.1016/j.compchemeng.2018.01.020
DO - 10.1016/j.compchemeng.2018.01.020
M3 - Article
AN - SCOPUS:85042377818
VL - 114
SP - 14
EP - 42
JO - Computers and Chemical Engineering
JF - Computers and Chemical Engineering
SN - 0098-1354
ER -