Hydraulic Model Studies for the Holcombe Dam

Sigurd H. Anderson

Research output: Book/ReportOther report

Abstract

Hydraulic model studies were made on a 1:43.2 model of the spillway section of the proposed Holcombe Dam to be constructed by the Northern States Power Company on the Chippewa River at Holcombe, Wisconsin. The spillway was designed by the Pioneer Service and Engineering Company of Chicago, Illinois.
Original languageEnglish (US)
StatePublished - Aug 1948

Fingerprint

Dive into the research topics of 'Hydraulic Model Studies for the Holcombe Dam'. Together they form a unique fingerprint.

Cite this