TY - GEN
T1 - Use of tire bales for erosion control projects in New Mexico
AU - Bandini, Paola
AU - Hanson, Adrian T.
AU - Castorena, Filiberto P.
AU - Ahmed, Saheem
PY - 2008
Y1 - 2008
N2 - The use of tire bales in civil engineering and transportation projects is receiving growing attention because of its potential to safely and economically dispose a large number of scrap tires. In recent years, tire bales have been successfully used as fill material in several erosion control and bank reconstruction projects in New Mexico. This paper describes two tire bale projects conceived and constructed by technical support engineers and maintenance crews of District 1 of the New Mexico Department of Transportation (NMDOT). In these projects, 160 to 610 tire bales (approximately 16,000 to 61,000 scrap tires) were used. The materials and construction details adopted in these projects and the standard practice resulting from the experience of NMDOT District 1 personnel are described. Some construction considerations in these projects include anchoring the bales to the ground, wrapping the layers of bales with gabion wire, and backfilling. Copyright ASCE 2008.
AB - The use of tire bales in civil engineering and transportation projects is receiving growing attention because of its potential to safely and economically dispose a large number of scrap tires. In recent years, tire bales have been successfully used as fill material in several erosion control and bank reconstruction projects in New Mexico. This paper describes two tire bale projects conceived and constructed by technical support engineers and maintenance crews of District 1 of the New Mexico Department of Transportation (NMDOT). In these projects, 160 to 610 tire bales (approximately 16,000 to 61,000 scrap tires) were used. The materials and construction details adopted in these projects and the standard practice resulting from the experience of NMDOT District 1 personnel are described. Some construction considerations in these projects include anchoring the bales to the ground, wrapping the layers of bales with gabion wire, and backfilling. Copyright ASCE 2008.
UR - http://www.scopus.com/inward/record.url?scp=66449083616&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=66449083616&partnerID=8YFLogxK
U2 - 10.1061/40972(311)80
DO - 10.1061/40972(311)80
M3 - Conference contribution
AN - SCOPUS:66449083616
SN - 9780784409725
T3 - Geotechnical Special Publication
SP - 638
EP - 645
BT - Proceedings of Sessions of GeoCongress 2008 - GeoCongress 2008
T2 - GeoCongress 2008: Characterization, Monitoring, and Modeling of GeoSystems
Y2 - 9 March 2008 through 12 March 2008
ER -