@inproceedings{a0f55827ee90403aaa41757a7d053a63,
title = "PEAK LEAD SHAVING WITH A FIXED BLADE, FIXED VANE PROPELLER TURBINE.",
abstract = "The hydroelectric facility owned by the City of Granite Falls, Minnesota, consisted of two Francis turbines supplying a total of 450 kW. The proposed addition of an 800 kW unit could only be justified if the cost was low, such as that of a fixed blade, fixed vane propeller turbine, and the new enlarged facility would be effective at peak loads. This, and other complications, resulted in an interesting and challenging operation scheme.",
author = "Gulliver, {John S.} and Russ Foster and Hedstrom, {Dean K.}",
year = "1988",
month = jan,
day = "1",
language = "English (US)",
isbn = "087262630X",
publisher = "ASCE",
pages = "1123--1130",
editor = "Clowes, {Brian W.}",
booktitle = "Unknown Host Publication Title",
address = "United States",
}